Full the spaces between the frame members with insulation.
Building an attic walkway.
The following are attic furnace installation requirements based on 2009 irc and 2009 imc the codes refer to it as appliances in attics.
Build a frame on 16 centers perpendicular to the attic floor joists.
After that screw it in place using the 2 inch deck screws.
Other structural issues are also factors including whether there is adequate space to install a stairway to the attic.
How to floor an attic.
Building code often requires stairway access to the attic if the space is to.
Our cable and internet company agreed.
Rip 1 2 thick plywood to 24 widths so it will fit up the attic stairs.
A 4 foot long plywood strip will need at least 8 screws on it.
Once you ve got the correct dimensions mark the entire perimeter with a shovel.
An attic walkway never trumps the safety and structural integrity of the house.
Apply construction adhesive on one side and place it on the horizontal chord.
Ensure that the end of the first plywood sheet lands on a piece of 2x leaving enough room to position the.
Before you start creating a floor for your attic you must make sure that it can handle the additional load.
Building your walkway in sections will let you easily handle any changes in elevation.
Use a tape measure to check the width of your path and adjust accordingly.
Screw the frame to the joists to secure it in place making sure not to screw into electrical wires.
Another cardinal rule when building an attic walkway.
Lay out the course of your walkway with two long pieces of rope.
An attic catwalk gives you a margin of safety when you are in the attic.
Then you ll need to build a.
Attic furnace access passageway and platform attic furnace passageway and.
The first plank is placed at the entrance of the attic walkway on the first horizontal chord.
Attic furnace walkway platform attic furnace installation must comply with you local mechanical code or imc international mechanical code if such was adopted in your area.